Friday, September 27, 2013

First Shipment From Topsider Arrived

Proposed Content:

Delivery and Unloading of the First House Parts From Topsider Homes.

A tight squeeze getting into the driveway even after the entrance was widened

Thursday, September 26, 2013

Completion Of Radiant Heat Tubing Installation

Proposed Content:

Jimmy and Doug finish laying the radiant floor heat tubing.

Amidst the shine of the floor foam and plumbers truck, Doug works on one of the manifold areas, where thermostats will manipulate actuators to control the floor temperatures of the zones on the east end of the house

Wednesday, September 25, 2013

Installing Propane Tank and Radiant Floor Heat Tubing

Proposed Content:

The laying of the radiant foor heat tubing, and the installation of the underground Propane Tank

Placing The Propane Tank:

Monday, September 23, 2013

Too Wet to Work

All Day:

Garret called to say no delivery from Topsider today as was scheduled long ago. Also said that it was too wet to begin foam installation. First Topsider shipment of house parts should be on Friday, Sep 27.