Proposed Content:
Delivery and Unloading of the First House Parts From Topsider Homes.
A tight squeeze getting into the driveway even after the entrance was widened
Proposed Content:
Delivery and Unloading of the First House Parts From Topsider Homes.
A tight squeeze getting into the driveway even after the entrance was widened
Proposed Content:
Jimmy and Doug finish laying the radiant floor heat tubing.
Amidst the shine of the floor foam and plumbers truck, Doug works on one of the manifold areas, where thermostats will manipulate actuators to control the floor temperatures of the zones on the east end of the house
Proposed Content:
The laying of the radiant foor heat tubing, and the installation of the underground Propane Tank
Placing The Propane Tank:
All Day:
Garret called to say no delivery from Topsider today as was scheduled long ago. Also said that it was too wet to begin foam installation. First Topsider shipment of house parts should be on Friday, Sep 27.