Thursday, September 5, 2013

Building The Foundation Wall Forms

Morning:

Garret called to tell us they misread the location of the circuit breaker panel and had mistakenly left an open space in the footer along the east side of garage wall. The circuit breaker panel should be on the back wall of the garage. They jack hammered the footer in the back garage wall to provide a gap for conduit installation. They will re-pour both sections of the footer when they pour the stem wall.

Correct placement for Conduits

Afternoon:

Lani and Gary arrived at the site as electricians were leaving. The electricians had installed the conduit in the back wall of garage. The concrete crew began setting up the two-foot high stem wall forms.

Conduits Installed

Initial Foundation Wall Form Panels

Putting Up The Forms